RAS LAFFAN COMMON COOLING WATER SYSTEM

Part of a team for the marine works for the EPIC tender design and procurement for one of the world's largest common cooling water systems.

The work for the Marubeni-Gama Consortium included the cooling water system, breakwaters and dredging, mathematical and physical modeling, the seawater intake and pumphouse and the discharge channel.

Qatar Water System 

NEW DOHA INTERNATIONAL AIRPORT

Doha International Airport

The construction of the new International Airport and the creation of its platform in the sea required the dredging and placement of some 65Mm3 of good reclamation fill, which had to be obtained in an environmentally friendly manner, together with the revetment to protect the fill, and the access channels. This involved the identification of some of the sources of fill available, and the writing of the Contract specification for the dredging and reclamation, including the required soil strengths, as well as specifying the relevant allowable losses during the dredging and reclamation processes. This required the prior agreement of those limits with the Authorities, as well as the methods of monitoring.

The reclamation process required the mixing of marine and land based fill and site trials of the performance of the dredged fill.

The platform is complete and work is continuing on the runways, buildings and infrastructure.

CLAIMS CONCERNING THE CONSTRUCTION OF A POWER STATION INTAKE

Following site investigations, writing an expert report on the claims concerning the likelihood of encountering rock, the dredging methods employed and the additional dredging plant required.