FRANCE

   

ARGELES BREAKWATER FAILURE

Preparation of a report examining the modes of failure, the responsibilities and proposal for methods of re-construction for theinsurer of an International Contractor whose reconstruction of a damaged breakwater, using 4m3 and 6m3 Accropode armour units, failed just prior to handover.